Production Management
One person owning the whole show — advance, load-in, showtime, strike — so the client talks to one number instead of four vendors.
You getA run-of-show and input list before the day, a crew that knows the plan, and someone standing in front of the client from before doors through strike.
Run of showCrew leadLoad-in / strikeSafety SOPs
Front-of-House Audio
Live mixing for bands, cabaret, and speakers — PA and monitors set, rung out, and changed over between acts without dead air.
You getPA and monitor deployment, mic plot and line check, a mix that sits right for the room, and act-to-act changeovers on the clock.
Allen & Heath (24-ch)PA / monitorsMic plotsFeedback control
Lighting Design & Control
DMX and Art-Net lighting built to the act — looks programmed, cued, and recalled, not a static wash left up all night.
You getA patched rig, looks built per act or per song, and a board op who can follow the show live.
DMX / RS-485Art-Net / sACNQLC+LED + conventionalPixel mapping
LED Video & Live Visuals
LED walls built, pixel-mapped, terminated and networked — then fed real-time, audio-reactive content instead of a looping stock file.
You getWall build and mapping, data and power terminated and networked, media server running, and visuals that move with the music.
LED wallsPixel mappingMedia serversReal-time VJ
Power, Cable & Rigging
The unglamorous half that decides whether a show happens — distro, cable, and fixture rigging done to spec, dressed, and labeled.
You getPower distribution planned to the load, cable pulled, routed, terminated and dressed, fixtures and truss rigged safely.
Power distroCable pull / terminate / dressFixture & truss riggingLine-voltage wiring
Show Networks
When lighting, video, and audio all ride the same Ethernet, someone has to own the addressing. That is a job, not an afterthought.
You getSwitching and IP plan for the show, Art-Net / sACN universes mapped, and a documented patch you can hand to the next tech.
Art-Net / sACN over IPNetwork switchingIP addressing